This project was very challenging, as it required the installation of a twin 1200 RCP pipeline and 3600x1200 RCBC line along Finders St and Stoke St, into Ross Creek. Trenching was up to 3m in depth and 4m wide, with all existing CBD infrastructure to contend with.
Job Details: |
|
Location: | Townsville |